Railway Hotel, Nailsworth
Tiling done by Jake Tyrrell
Railway Hotel, Nailsworth
Tiling done by Jake Tyrrell
Railway Hotel, Nailsworth
Tiling done by Jake Tyrrell
Railway Hotel, Nailsworth
Hot water and underfloor heating tank fed from bio-mass boiler
Railway Hotel, Nailsworth
Hot water and underfloor heating tank fed from bio-mass boiler
Railway Hotel, Nailsworth
Main building
Hot water and underfloor heating tank feeding two apartments and two flats fed from bio-mass boiler
Railway Hotel, Nailsworth
Main building
Hot water and underfloor heating tank feeding two apartments and two flats fed from bio-mass boiler
New Rayburn installation fired on natural gas
Old Bisley Road.
Custom design style taps specified by customer
Old Bisley Road.
Custom design style taps specified by customer
Old Bisley Road.
Free standing bath with custom design style taps specified by customer
Old Bisley Road.
Custom design style taps specified by customer
Old Bisley Road.
Old brushed effect brass shower specified by customer
Old Bisley Road.
Central heating and hot water system
Shortwood.
1960's system upgraded with 65kw Worcester Bosch boiler, heat exchanger installed as a precautionary measure due to age of system
Shortwood.
1960's system upgraded with 65kw Worcester Bosch boile, heat exchanger installed as a precautionary measure due to age of system
J Rool, Stroud.
Complete new installation of heating system and upstairs bar.
(boiler pictured)
Heat exchanger bent for hot tub.
Heat exchanger bent for hot tub.